Project Builder

Premium Turf Materials

20191105 150346 scaled 1
Eco 96 Installation Service
Material: $2.40/SF
$0.00
Remove

Installation Phases

Phase 1: Excavation & Prep
Show Technical Specs â–¼
Excavation Depth: 3 Inches
Material Removal: 0 Cubic Yards.
$0.00
Phase 2: Sub-Base Engineering
Show Technical Specs â–¼
Base Material: Class II Road Base
Required Material: 0 Tons.
$0.00
Phase 3: Fitting & Finishing
Show Technical Specs â–¼
Custom cuts, Perimeter tucking, and Power brushing.
$0.00

Maintenance & Hardscape

Seal Existing Concrete
$0.00
ESTIMATED TOTAL $0.00