Project Builder

Premium Turf Materials

Synthetic Grass Techs Eco 74 Pro RM50 Web 01 3
Eco 74 Installation Service
Material: $1.82/SF
$0.00
Remove

Installation Phases

Phase 1: Excavation & Prep
Show Technical Specs ▼
Excavation Depth: 3 Inches
Material Removal: 0 Cubic Yards.
$0.00
Phase 2: Sub-Base Engineering
Show Technical Specs ▼
Base Material: Class II Road Base
Required Material: 0 Tons.
$0.00
Phase 3: Fitting & Finishing
Show Technical Specs ▼
Custom cuts, Perimeter tucking, and Power brushing.
$0.00

Maintenance & Hardscape

Seal Existing Concrete
$0.00
ESTIMATED TOTAL $0.00